Le dimanche 26 juin, Transports-Québec vous invite à planifier vos déplacements

Télécharger le PDF →

Follow-Us !

  • Follow
  • Follow
  • Follow
  • Follow
  • Follow

Subscribe !

to our newsletter

Yes !
Q
Close
Q
Close

Le p’tit train du nord

Non-profit organization (NPO)

Information, shop and administration – Prévost Station

1272 Rue de la Traverse, Prévost, QC J0R 1T0

450 745-0185
info@traindunord.com

Hello?

450 745-0185
info@traindunord.com

Privacy Policy →

French →

Route verte P'tit train du nord
© Le p’tit train du nord

Realisation: Tramweb

Explore

  • Home
  • Interactive Map
  • FAQ
  • Contact Us

X

MONT-LAURIER TO LA MACAZA

LABELLE TO VAL-MORIN

SAINTE-ADÈLE TO SAINT-JÉRÔME

MIRABEL TO BOIS-DES-FILION

Discovery Passport

Activities

  • Home
  • Interactive Map
  • FAQ
  • Contact Us

X



WALKING AND RUNNING



RIDING



SKI



SNOWMOBILE

INFOS

  • Home
  • Interactive Map
  • FAQ
  • Contact Us

X

participate

  • Make a donation
  • Shop
  • Home – Boutique P’tit Train du Nord
  • Eco-friendly

INFORM YOURSELF

  • FAQ
  • Communiques
  • Blog
  • Events

OTHER

  • Parkings
  • Code of ethics
  • Rental – Workshop service
  • Discovery pass

US

  • Home
  • Interactive Map
  • FAQ
  • Contact Us

X

About US

  • About Us
  • Contact Us

TEAM

  • The Team
  • Patrol

OTHER

  • Documentation
  • Press
Q

Trail conditions

OPENINGS AND CONSTRUCTION WORK

🚴‍♀️ Trail Opening

The P’tit Train du Nord trail is open between Bois-des-Filion (km 32.5) and Labelle (km 112). Beginning May 16, the section from Labelle (km 112) to Mont-Laurier (km 201) will also be open.

⚠️ Caution: During the spring season, the MRCs are carrying out various maintenance and construction projects (see details below). Some sections may still contain gravel, sand buildup or ruts on stone dust surfaces. Please adjust your speed according to trail conditions.

The P’tit Train du Nord is a family-friendly multi-use trail. Please respect the code of ethics and consult trail conditions before your trip:

https://ptittraindunord.com/en/code-of-ethics/
https://ptittraindunord.com/en/trail-conditions/

Courtesy, smiles and kindness are always appreciated 🙂


 

🚧 Construction – Saint-Agathe Sector – DETOUR

From May 19 to June 12, the bike path will be closed between the train station at km 49.1 and km 50 to allow work to be carried out under the viaduct.

➡️ A marked and secure detour is available via the following streets:
• Sainte-Adèle
• Saint-Vincent
• Saint-Antoine
• Saint-Paul

📍 A 200 m path will also allow cyclists to walk their bikes to reconnect with the north section of the trail.

Thank you for your cooperation and caution near the construction zone.

Please refer to the SAINTE-AGATHE detour map below.


🚧 WORK IN PROGRESS | Kilometres 11.7 to 14 — City of Prévost (between Mozart Street and Station Street)

✅ Open on Saturday, June 13 and Sunday, June 14

For your safety, please note the following conditions:

• Pavement quality is reduced and the surface may be uneven
• Construction equipment may be present on and around the trail
• Extra caution is required from all users
• The detour route remains accessible at all times

As the MRC is responsible for the P’tit Train du Nord within its territory, roadway rehabilitation and drainage improvement work will be carried out in this sector to ensure user safety and the long-term sustainability of the trail.

📅 Work start date: Update — work began on June 1
⏳ Expected duration: approximately eight weeks

As part of the ongoing work, every effort is being made to keep the trail accessible on weekends. However, access to certain sections depends on construction progress and may vary.

Some direct accesses to the trail, including those serving local businesses, will be temporarily closed during the work.

🔗 For more information:
www.mrcrdn.qc.ca/actualites/travaux-ptdn-phase1

Thank you for your understanding and cooperation.

 

 

 

 

 

 

 


Temporary Trail Closure in Blainville

⚠️ Trail Closure – Blainville Sector

A section of the P’tit Train du Nord trail will be temporarily closed from km 13.6 South to km 14.2 South, near 92nd Avenue East, extending to the right-of-way opposite 5e Régiment-d’Artillerie Street.

📅 Closure Date: Monday, June 15, 2026
🕖 Time: Beginning at 7:00 a.m. until work is completed

➡️ Detour: Trail users are asked to follow the detour route via Sentinelle Street.

🚧 Reason for the closure: Corrective work on the stormwater pipe serving the Sentinelle Basin.

We thank all users for their understanding and cooperation. Please respect the posted signage and exercise caution when approaching the work zone.

 

Close this window
infolettre