Planned work

📍🚧 Le P’tit Train du Nord continues to enhance in order to improve and maintain the quality and safety of the trail.🏞

 

 

  • May 19 to june 3 📍🚧: Closed trail ⛔ punctually between Parc Lépine (Sainte-Adèle) and Piedmont station. The work concerns the replacement of 2 culverts (km 24.1 and km 24.3). No detour possible 🚳 when workers are on site. 👷‍ Machinery circulation 🚜 and major excavation ⚠️. Please respect the signage in place. 🚩

 

  • May 28 to June 5 📍 🚧 Vegetation control work 🌲 is underway on the territory of the City of Rosemère. The track remains accessible during this work. ✅ Please circulate carefully and respect the workers’ area. 👷‍

 

  • May 30 to June 2 📍 🚧 : The City of Prévost is carrying out work to connect the aqueduct network at the intersection of Guénette and Lavasseur streets, under the surface of the P’Tit Train du Nord. Please respect the signs in place and the instructions to get off your bike🚳 when indicated. 🚩⚠️ The trail remains accessible during this work. ✅

 

  • June 2 to 5📍 🚧 Drainage works will take place on the territory of the Antoine-Labelle MRC, in the. Sector of Bellerive, km 141 (Nominingue). The trail remains accessible during this work. ✅ Please circulate carefully and respect the workers’ area.👷‍

 

  • Until July 17📍 🚧 Vegetation control work 🌲 and drainage will take place on the territory of the MRC des Laurentides, between Val-Morin and Sainte-Agathe-des-Monts. The trail remains accessible during this work.✅ Please circulate carefully and respect the workers’ area. 👷‍ Click here to read the press release.

 

 

infolettre